The room-by-room snagging checklist.
All 138 checkpoints, room by room, printable and ruthless about the things that actually matter on handover day.
A snagging survey is a non-destructive visual inspection of your new build against housebuilder and NHBC standards. It is not a RICS Home Survey, not a HomeBuyer Report, and not a structural survey. We do not lift finishes, open up ceilings or test hidden services.
- Member, Residential Property Surveyors AssociationRPSA
- Chartered Institute of BuildingCIOB
- £2m cover in placeProfessional indemnity & public liability
- Enhanced check completedDBS
No spam. One follow-up email, then only if you ask.
Free download
Every check, room by room.
All 138 checkpoints, printable, room by room.
01Documents & handover pack
Do this first. Missing paperwork is the defect that costs you most later, because it is the paperwork that proves what you are owed.
- Warranty certificate. Confirm you hold the NHBC, LABC, Premier Guarantee or equivalent certificate and the policy number. Note the start date: your two-year builder liability period runs from it.
- Building Regulations completion certificate. Should have been issued. Ask for a copy in writing if it is not in the pack.
- Home User Guide. Check it covers your specific plot and house type, not a generic development booklet. Appliance manuals and guarantees should be included.
- Boiler commissioning. Benchmark service book present, completed and signed. Unsigned commissioning can invalidate the manufacturer's guarantee.
- Electrical certification. Electrical Installation Certificate and Part P notification. Check the circuit schedule matches the labels inside your consumer unit.Pro inspection
- Ventilation commissioning. Extract and MVHR systems must be commissioned to measured airflow rates. Ask for the commissioning sheet: it is very often missing.Pro inspection
- Meter readings. Gas, electric and water readings recorded, dated and photographed on the day you take the keys.
- Keys, fobs & restrictors. Test every key and fob supplied, including window keys, garage, gates and meter cupboards.
- Isolation points. Locate and label the stopcock, external stop-tap, consumer unit and gas isolation valve before you need them in a hurry.
- Plot plan & specification. Compare boundary treatments, parking, turfing and upgrades against what you paid for. Missing specification items are a contractual issue, not a snag.
02Entrance & hallway
03Stairs & landing
The stairwell is the largest opening in the structure, so it shows movement first, and it carries the highest safety risk in the house.
04Kitchen & utility
The most expensive room to put right after you move in, and the room where damage is hardest to prove was not yours. Inspect it first.
05Bathrooms, en-suites & WCs
Nearly every long-term problem in a new build bathroom starts as a sealant, ventilation or fall defect that was visible on handover day.
06Bedrooms & living areas
07Windows & external doors
08Loft, plant & ventilation
More significant defects hide above the loft hatch than anywhere else. Do not enter unless there is safe boarded access and someone else is home.
09Garage & outbuildings
10External walls, roof & rainwater
11Drives, paths, drainage & garden
12Whole-house safety sweep
Run this last, across the entire property. These are the items where a defect is not an inconvenience.