A snagging survey is a non-destructive visual inspection of your new build against housebuilder and NHBC standards. It is not a RICS Home Survey, not a HomeBuyer Report, and not a structural survey. We do not lift finishes, open up ceilings or test hidden services.

Credentials
  • Member, Residential Property Surveyors Association
    RPSA
  • Chartered Institute of Building
    CIOB
  • £2m cover in place
    Professional indemnity & public liability
  • Enhanced check completed
    DBS

Unlock the full room-by-room checklist.

Drop your email and we'll unlock all 138 checklist items on this page, plus a print-ready PDF you can share with your partner or family before you decide.

One email, no spam. Unsubscribe any time.

No spam. One follow-up email, then only if you ask.

Free download

Every check, room by room.

All 138 checkpoints, printable, room by room.

01Documents & handover pack

Do this first. Missing paperwork is the defect that costs you most later, because it is the paperwork that proves what you are owed.

  • Warranty certificate. Confirm you hold the NHBC, LABC, Premier Guarantee or equivalent certificate and the policy number. Note the start date: your two-year builder liability period runs from it.
  • Building Regulations completion certificate. Should have been issued. Ask for a copy in writing if it is not in the pack.
  • Home User Guide. Check it covers your specific plot and house type, not a generic development booklet. Appliance manuals and guarantees should be included.
  • Boiler commissioning. Benchmark service book present, completed and signed. Unsigned commissioning can invalidate the manufacturer's guarantee.
  • Electrical certification. Electrical Installation Certificate and Part P notification. Check the circuit schedule matches the labels inside your consumer unit.Pro inspection
  • Ventilation commissioning. Extract and MVHR systems must be commissioned to measured airflow rates. Ask for the commissioning sheet: it is very often missing.Pro inspection
  • Meter readings. Gas, electric and water readings recorded, dated and photographed on the day you take the keys.
  • Keys, fobs & restrictors. Test every key and fob supplied, including window keys, garage, gates and meter cupboards.
  • Isolation points. Locate and label the stopcock, external stop-tap, consumer unit and gas isolation valve before you need them in a hurry.
  • Plot plan & specification. Compare boundary treatments, parking, turfing and upgrades against what you paid for. Missing specification items are a contractual issue, not a snag.

02Entrance & hallway

03Stairs & landing

The stairwell is the largest opening in the structure, so it shows movement first, and it carries the highest safety risk in the house.

04Kitchen & utility

The most expensive room to put right after you move in, and the room where damage is hardest to prove was not yours. Inspect it first.

05Bathrooms, en-suites & WCs

Nearly every long-term problem in a new build bathroom starts as a sealant, ventilation or fall defect that was visible on handover day.

06Bedrooms & living areas

07Windows & external doors

08Loft, plant & ventilation

More significant defects hide above the loft hatch than anywhere else. Do not enter unless there is safe boarded access and someone else is home.

09Garage & outbuildings

10External walls, roof & rainwater

11Drives, paths, drainage & garden

12Whole-house safety sweep

Run this last, across the entire property. These are the items where a defect is not an inconvenience.

128 more checks hidden.

Enter your email above to unlock the full checklist.

Book your survey
CallSee your price